15.07.2013 KP200T Tunnel Header at the Construction of Metro Station
Files:  Download

15.07.2013 Work of Experience of Remote-Controlled KP21 Machines.
Files:  Download

30.05.2013 “Coal” Journal, December, 2010, Synthesis of Traditions and Current Technologies
Files:  Download

30.05.2013 “Coal” Journal, November, 2010. Kopeysk KP21 Road Header is a Record Holder
Files:  Download

14.05.2013 Mining Report Glückauf, Journal, No. 4, 2010 MPK – 3 B Drill Loader
Files:  Download

14.05.2013 “Coal” Journal, March, 2011 Upgrading of Machining Processing
Files:  Download

14.05.2013 “Coal” Journal, June,2010 Experience of Making of Mining Machines of Cyclic Operation with an Operating Member of Drum-Type
Files:  Download